Skip to content

    Molded in Québec · Shipping across Canada

    Reshoring & molds · 6 min read

    Injection mold transfer checklist: what to prepare before you move a mold

    Mold transfer checklist: data to send, ownership and stock build before pickup, crating and customs, then inspection, trial run and first-article approval.

    By Plastiques Horizon · Published

    Short answer

    An injection mold transfer checklist covers four stages: gather the mold data (drawings, part samples, resin, cycle time, cavities, press tonnage, hot runner and IML details), confirm ownership and build safety stock before the mold leaves, plan crating, transport and customs with a broker, then inspect the mold, run a trial and approve first-article parts before production starts.

    Key points

    • A mold transfer goes faster when the new molder receives drawings, part samples, resin grade, cycle time, cavity count and press tonnage before anything else.
    • Written proof of mold ownership and a release from the current molder should be in hand before the mold is crated.
    • A final production run at the current molder builds the stock that covers transit, inspection, trial and approval.
    • Last-shot parts from the current molder give you a reference to compare against the first articles from the new plant.
    • Approval should happen on your own filling and sealing line, not only on a measurement report.

    What is an injection mold transfer?

    An injection mold transfer is the move of an existing mold from one molder to another, so that the new molder produces the same part from the same tool. The mold owner keeps the tool; only the place where it runs changes. Transfers happen when a company consolidates suppliers, moves production closer to its market, or brings production from the United States to Canada.

    Most transfer problems come from missing information or rushed timing rather than from the mold itself. The checklist below follows the six-step mold transfer process used by Plastiques Horizon, and it works with any molder. If you are still deciding whether a transfer makes sense, start with why transfer injection molds to Canada.

    What information should you send the new molder first?

    The new molder needs enough data to answer one question: will this mold run in my presses, with my auxiliary equipment? Send what you have; missing items are normal, and a good molder tells you what is still needed.

    Stage 1: mold information to gather
    ItemWhy it matters
    Mold drawings or 3D files (2D CAD, STEP or IGES)Overall mold dimensions, locating ring, sprue and ejection layout for the press fit check
    Part samples, ideally from the last production runThe physical reference for dimensions, weight and appearance
    Resin grade and supplier, colour or masterbatchSame material, same part behaviour; a resin change can affect fit and seal
    Cycle time and number of cavitiesOutput per hour and the basis for production planning
    Press tonnage and model the mold runs on todayThe starting point for clamp force, platen size and tie-bar spacing checks
    Hot runner type and controller requirementsZone count, connectors and controller compatibility
    IML robot or label-handling interface, if decoratedIn-mold labeled parts need a compatible robot and end-of-arm tooling
    Annual volume and target start dateLets the molder plan press time and the transfer schedule

    Add anything else you hold: the part specification or quality drawing with critical dimensions, the maintenance log, a list of spare parts and inserts, and any known issues. For decorated containers, include the label specifications so the in-mold labeling set-up can be checked.

    What must be done before the mold leaves the current molder?

    1. Confirm ownership in writing. Locate the tooling invoice, purchase order or tooling agreement that shows you own the mold. See who owns an injection mold.
    2. Settle open invoices and request the release. Give the current molder written notice of the transfer and agree on a pickup date.
    3. Run a final production run. Build enough stock to cover transit, inspection, trial run and your own line approval, plus a margin.
    4. Keep last-shot samples. Ask for parts from the final cycles, labelled by cavity, as a reference for the new molder.
    5. Document the mold’s condition. Photos and a written condition report at pickup protect both sides if a question comes up later.
    6. Collect everything that belongs with the mold. Spare parts, inserts, electrode or EDM records if available, hot runner cables and any dedicated end-of-arm tooling.
    7. Have the mold cleaned and protected for transport. Rust preventive on steel surfaces and water lines drained are standard practice.

    How do you handle shipping and customs for a mold?

    A mold is heavy, valuable and easy to damage, so it travels crated on a skid, with the parting line protected and the halves secured. If the mold crosses from the United States into Canada, it is a commercial import. The Canada Border Services Agency (CBSA) explains the general steps in its guide to importing commercial goods: identify the goods, determine their tariff classification, value for duty and origin, report them at the border and account for duties and taxes.

    Most companies use a licensed customs broker for this; CBSA publishes the list of licensed brokers. Ask your broker how the mold should be classified and valued, who acts as importer of record, and what documents the carrier needs. This article does not give a customs or legal conclusion; your broker does.

    • Commercial invoice or pro forma invoice describing the mold, its value and its country of origin.
    • Proof of ownership, which the broker may ask for.
    • Packing list with crate dimensions and weight.
    • Carrier booking with a pickup window that matches the release date agreed with the current molder.
    • Insurance cover for the mold in transit.

    What happens when the mold arrives?

    Arrival is where problems should be found, before production rather than during it. At Plastiques Horizon the mold is inspected, cleaned and its condition documented before it goes in a press. Then comes a trial run.

    Stage 4: arrival, trial and approval
    StepWhat to checkWho signs off
    Arrival inspectionDamage in transit, condition versus the pickup report, water lines, ejection, hot runner wiringNew molder, report shared with you
    Trial runThe mold fills, cools and ejects correctly at a stable cycleNew molder
    First-article measurementCritical dimensions and weight against the drawing and last-shot samples, cavity by cavityNew molder and your quality team
    Line trialFill, seal, lid fit and stacking on your own equipmentYour production team
    Production approvalWritten approval to start regular productionYou

    For a film seal container, the line trial matters most: seal quality depends on the rim, so run the first articles on your own sealing equipment. Plastiques Horizon’s own Round Film Seal line, for comparison, is built to the 409 diameter so it fits existing 409 fill-and-seal lines.

    When can you stop the parallel supply?

    Keep your previous source running, or keep the stock from the final run untouched, until you have signed the production approval and received the first regular production shipment. Only then is the transfer complete. If you have a second mold or another qualified source, you may choose to keep it as a backup; our guide to injection molding at the plant explains how production is organized.

    Using this checklist with Plastiques Horizon

    Plastiques Horizon reviews each mold against its Sumitomo presses and, for decorated parts, its Wittmann IML robotics, then plans logistics with you and your broker, inspects the mold on arrival and sends first-article samples for approval. Lead times and pricing are confirmed with your quote. To start, send the stage 1 information through the contact page or call 1-877-630-4095, Monday to Friday, 8:00 to 17:00 Eastern.

    Frequently asked questions

    What file formats should I send for an injection mold transfer?

    For an injection mold transfer, send 2D CAD drawings and 3D files in a neutral format such as STEP or IGES, along with the part drawing. If you do not have files, part samples and a written description of the mold (size, cavities, press tonnage) are enough to start a compatibility review.

    Can I transfer a mold without part drawings?

    Often, yes. Physical part samples from the last production run can serve as the reference, and the new molder can measure them. A drawing with critical dimensions still makes approval easier, because both sides agree in advance on what a good part is.

    What are last-shot samples?

    Last-shot samples are parts taken from the final cycles of a mold before it is removed from the press, usually labelled by cavity. They show the mold’s condition at pickup and give the new molder a direct comparison for the first articles produced after the transfer.

    Should a mold be serviced before or after it is transferred?

    Both are common. A cleaning and rust protection before shipping is standard; a full inspection after arrival finds wear or transit damage before production. Agree in advance which molder does which work and who pays, so the transfer is not delayed by a maintenance dispute.

    Sources

    External references consulted for this article. General information only, not legal or regulatory advice.

    1. Guide to importing commercial goods into Canada · Canada Border Services Agency
    2. Guide d’importation de marchandises commerciales au Canada · Agence des services frontaliers du Canada
    3. Gather information about the goods you want to import · Canada Border Services Agency
    4. Licensed customs brokers · Canada Border Services Agency

    →Mold transfer review

    Tell us about your mold.

    We check press compatibility first and come back with a clear yes, or what would need to change. Drawings help.

    Prefer to talk? Call

    1-877-630-4095

    Mon–Fri, 8:00–17:00 ET

    Where is the mold today?

    Plastiques Horizon Inc. collects this information to answer your request and prepare a quote. Only our sales team has access to it. It reaches us through service providers located in the United States (website hosting and email delivery). You can access, correct or withdraw it at any time by writing to [email protected]. Privacy policy